The challenge
A leading integrated energy company needed to evacuate its employees from Iraq because of a developing perilous situation. It had tested its crisis evacuation plan, which included simulating a land evacuation, because it was assumed air evacuation would not be possible. With limited departure options that were in continuous flux due to erratic conditions, the global energy producer needed help identifying and coordinating immediate travel arrangements and safe passage for its personnel.